Real projects.
Real outcomes.

Every project below ran on a written scope, daily CompanyCam photo documentation, and weekly progress reports. Scopes, timelines, and outcomes are real — not estimates or averages.

Start Your Renovation Plan ★
9
Projects Below
$2.6M+
In Sales Assisted 2026
67
Windows Installed (HI Express)
4 days
Fastest Complete Scope
Featured · Gut to Sold
Full Home Renovation · Residential · Pre-Sale

Highland Hills — Complete Whole-Home Renovation

Cottage Grove, MN  ·  Client: David F., Renovo Capital  ·  Listed & Sold by Ryan W., Taylrd Real Estate

Home Size
5,600 sq ft
Duration
4 weeks
Renovation Budget
$120,000
List Price
$650,000
Sale Price
$700,000 cash
Over Ask
$50,000 (7.7%)
Days to Offer
2 days · 12+ showings
Renovation Budget
$120,000
Highland Hills theatre before — red walls, gray wainscot, bare concrete
Before
Highland Hills home theatre after — acoustic panels, sconces, recliners
After
Highland Hills kitchen before — dark espresso cabinets, island
Before
Highland Hills kitchen after — white cabinetry, quartz island, pendant lights
After
Highland Hills kitchen before — stainless appliances, dark cabinets
Before
Highland Hills kitchen after — new stainless appliances, white cabinetry, quartz counters
After
Highland Hills primary bath before — dated vanity
Before
Highland Hills primary bath after — soaking tub, double vanity
After
Scope of Work
  • Two full bathroom renovations — new tile, vanities, countertops, fixtures
  • Painted all walls and trim throughout the home
  • Hardwood floor refinish — sand, stain, and seal main floor
  • New carpet installation throughout
  • Painted vanities and cabinetry
  • New countertops throughout
  • New appliance package
  • Repaired and replaced failing stamped concrete patio
  • Landscaping removal and refresh
  • Added siding on exterior elevation
  • Painted front exterior trim and updated exterior lighting
  • Home theatre build-out — acoustic panels, sconces, screen
Sale Outcome
$700k cash
+$50k over ask
Listed at $650k. Accepted all-cash $700k offer — turned down $725k offer to take the cleaner close. 12+ showings in 2 days of listing. Offer accepted day 2. Contingencies cleared day 3. Closed in 30 days. $120k renovation investment on a property that sold $50k over ask.
Timeline
4 weeks
Full scope completed on 5,600 sq ft property in 4 weeks. All work photo-documented daily via CompanyCam. Delivered on the realtor's listing timeline.
Gut to Sold
Full Home Renovation · Residential · Pre-Sale

Dawn Way — Full Renovation & Sale

Twin Cities Metro  ·  Client: Isaac M., Wells Property Solutions  ·  Listed & Sold by Ryan W., Taylrd Real Estate

Renovation Budget
$45,000
Duration
3 weeks
Realtor
Ryan W., Taylrd Real Estate
Renovation Budget
$45,000
Dawn Way before — lower level dated condition
Before
Dawn Way after — new LVP, fresh paint
After
Dawn Way kitchen before — gut condition, full contents
Before
Dawn Way kitchen after — white cabinets, granite, hardwood
After
Scope of Work
  • New deck construction
  • LVP flooring installed throughout
  • New interior and exterior doors
  • New trim throughout
  • Full kitchen renovation
  • New exterior doors
  • New garage door
  • Full interior paint
Outcome
Sold
Property taken from dated condition to listed and sold. Full scope completed in 3 weeks. One of two Taylrd-listed properties in 2026 with Nexus renovation work, contributing to over $2.6M in combined sales assisted.
Pre-Listing · Remote Project
Full Home Renovation · Residential

Alder St — Full Home Renovation

Bemidji, MN  ·  Realtor: Alicia H., Bridge Realty

Renovation Budget
$65,000
Home Size
4,800 sq ft
Duration
22 working days
Location Challenge
Remote — long commute, team on-site
Renovation Budget
$65,000
Bemidji kitchen after renovation
After
Bemidji living room after — staged for listing
After
Scope of Work
  • New flooring throughout the 4,800 sq ft home
  • Full interior paint — all walls and trim
  • New trim package throughout
  • 3 full bathroom renovations
  • New appliances in two kitchens
  • New interior doors throughout
  • New lighting throughout
  • New fixtures throughout
Timeline
22 working days
Full scope on a 4,800 sq ft property completed in 22 working days despite a long commute from the Twin Cities metro to Bemidji. Team managed remote logistics for the full duration.
Project Challenge
Remote site management
Extended crew deployment to Bemidji for the full project. Daily documentation via CompanyCam kept the agent and client informed without requiring in-person oversight.
Residential · Bathroom
Full Bath Renovation · Structural + Finish

Northeast Minneapolis — Full Bath Rebuild

Northeast Minneapolis, MN  ·  Client: Derek D.

Renovation Budget
$16,000
Duration
6 days
Complexity
Structural + plumbing + finish
Renovation Budget
$16,000
NE Minneapolis bath before — full room, dated finishes, shower curtain
Before
NE Minneapolis bath after — floating vanity, subway tile, slate floor
After
Scope of Work
  • Repaired failed subfloor under bathroom
  • New LVP in kitchen and pantry
  • Subfloor repair and replumb in bathroom
  • New tub install
  • Tile surround to ceiling — full height
  • New floating vanity — recentered to room
  • Recessed medicine cabinet
  • Reframed walls to accommodate niche and cabinet
  • Moved vanity light to center
  • New door and trim
  • Full paint
  • Flattened ceiling
  • New ceiling vent and light fixture
Timeline
6 days
Full structural, plumbing, and finish scope completed in 6 working days. Subfloor repair, replumb, tile installation, floating vanity centering, and full paint in under one week.
Key Challenge
Structural reframe to center vanity
The floating vanity required reframing walls to hit the proper center. Recessed medicine cabinet and niche required additional framing. All structural work was absorbed into the 6-day timeline.
Residential · Powder Bath
Powder Bath Renovation · Plumbing + Finish

Minneapolis — Basement Powder Bath

Minneapolis, MN  ·  Clients: Emily & Alex T.

Renovation Budget
$8,000
Duration
4 days
Specialty
Automated urinal + plaster repair
Renovation Budget
$8,000
Minneapolis powder bath before — neutral gray, basic
Before
Minneapolis powder bath after — Iron Ore drench, urinal, chrome fixtures
After
Scope of Work
  • Full replumb to accommodate urinal addition
  • Automated urinal installation
  • New toilet installation
  • Plaster repair after replumb
  • Color drench in SW Iron Ore — walls, ceiling, trim, door
  • New trim package
  • Painted door
  • New mirror and light fixture
Timeline
4 days
Full replumb, urinal install, plaster repair, and complete finish scope in 4 working days.
Design Note
SW Iron Ore color drench
Full color drench in Sherwin-Williams Iron Ore — walls, ceiling, trim, and door. Intentional moody finish that works with the chrome and white fixtures. Before and after contrast is dramatic.
Commercial · Occupied Hotel
Commercial Renovation · Occupied Building · Window Replacement

Holiday Inn Express — 67-Window Installation

Golden Valley, MN  ·  Occupied Hotel · Active Guest Operations

Renovation Budget
$65,000
Duration
40 working days
Windows
67 units installed
Building Status
Occupied — guests on site
Access Method
Lifts · room blocks · phased
Renovation Budget
$65,000
Holiday Inn Express — aerial lift during window installation, privacy fencing, active job site
During
Scope of Work
  • General conditions management for full project duration
  • Coordinated room block scheduling with hotel management
  • Removed existing stucco on exterior elevations
  • Removed 67 existing windows
  • Removed interior trim kits on all affected rooms
  • Protected each room and floor from construction activity
  • Installed 67 new windows — full perimeter
  • Painted interior of all affected rooms after installation
  • Installed privacy fencing at exterior work zones
  • Traffic control — coned and staged exterior access
  • Lift equipment — operated aerial lifts for exterior elevations
Scale
67 windows
40 working days
Full window replacement on an occupied hotel — guests remained on property throughout the entire project. Zero guest displacement. Work was phased around occupancy using room blocks coordinated with hotel management.
Key Challenge
Zero guest complaints
Exterior lift work, stucco removal, and full window replacement on an occupied building. Protection, containment, and scheduling were the primary deliverables — the window installation was the easy part.
Residential · Flooring & Finish
Flooring · Carpet · Trim · Paint · Stain Match

Edina — Flooring & Finish Package

Edina, MN  ·  Clients: Fouad & Remi B.

Renovation Budget
$9,000
Surfaces
Carpet · LVT · Hardwood stairs
Specialty
Brazilian cherry stain match
Edina stairs before — pink rubber treads
Before
Edina laundry/mudroom before — red VCT floor
Before
Edina mudroom and stairs after — new LVP, hardwood treads
After
Edina sunroom after — new carpet, floor-to-ceiling windows
After
Edina lower level after — new carpet, recessed lighting, staged
After
Edina laundry room after — new LVT, painted
After
Edina basement room after — new carpet, white walls
After
Scope of Work
  • New carpet — basement, sunroom, and stairs
  • New trim package in all carpeted areas
  • New LVT flooring — garage entry, mudroom, laundry room, and powder bath
  • Painting stair skirts and railings
  • Hardwood stair treads installed — stain matched to existing Brazilian cherry floors
Timeline & Budget
$9,000
Multi-surface flooring scope across basement, sunroom, stairs, mudroom, laundry, and powder bath — completed at $9,000 on an occupied Edina property.
Technical Challenge
Brazilian cherry stain match
New hardwood stair treads required a precise stain match to the existing Brazilian cherry hardwood floors. Color was matched on-site before installation — seamless transition from existing flooring to new treads.
Commercial · Hospitality · Engineering
Rooftop Bar · Retractable Roof System · Permit & Inspection

AC Hotel Minneapolis West End — Reveal Rooftop Bar

Minneapolis, MN  ·  Occupied Hotel  ·  Active Rooftop Bar

Project Type
Retractable roof + window wall system
Steel Brackets
8 custom fabricated
Outcome
365-day bar operation
Delivery
Permit through final inspection
AC Hotel Minneapolis — Reveal Rooftop Bar retractable roof system, panels open
Installed
Scope of Work
  • Permit execution — coordinated engineering drawings and city approval process
  • Worked directly with steel fabricator to design and install 8 custom steel brackets anchored to structural beams beneath the roof deck
  • Rebuilt parapet wall to accommodate new system
  • Demo of existing roof system
  • New EPDM roofing installation
  • Installed motorized retractable roof panel system — panels retract laterally and overhead
  • Installed retracting window wall system along the perimeter
  • Folding door system to be added — will enlarge and enclose the space further
  • Carried project through final inspection and city sign-off
Revenue Impact
365 days
Year-round operation
Before installation, the Reveal Rooftop Bar was limited by Minnesota's weather. The retractable roof and window wall system allows the bar to remain open and revenue-generating year-round — a direct impact on the hotel's F&B performance.
Complexity
Engineering + fabrication + permit
This was not a standard contractor scope. We managed the permit process with the city, coordinated custom steel fabrication, rebuilt the parapet, replaced the roof membrane, and installed a moving architectural system — all on an occupied, operating hotel.

Ready to be the
next case study?

Use the planner to scope your project before we talk — it takes 3 minutes and helps us write your estimate faster.

Start Your Renovation Plan ★ (651) 283-0266